Rendering & Plastering

Capability

BSel Contracts pride ourselves in offering an excellent plastering and external rendering service covering the full package which cater for both commercial & domestic clients.

We work closely with our clients whether it is a new build, refurbishment or residential projects ensuring our knowledge, expertise and support is there from start to finish

Our experienced teams can apply an exterior render system to the façade that will enhance its appearance and ensure that it is protected against wear and tear from the elements in the years to come. 

We are fully competent in using the following systems;

And in using the following brands;

And more…

The Team

All our operatives are qualified to NVQ Level 2 or 3 and are are pro efficient in creating and applying textures to surfaces, creating lighting scenes to match the mood and setting of the project. Our supervisors collaborate with designers and architects to achieve the desired visual effect and troubleshooting any issues that arise during the rendering process.

Our operatives have Proficiency in rendering products as shown above and have ability to notice small details that can make a big difference in the final product.

Past Project Case Studies

Project Objectives:

The Chocolate Factory Block E2 is part of the wider redevelopment of the former sweet factory built in the 1930s, located in the Wood Green Cultural Quarter off Clarendon Road which will see the creation of 230 new homes, the refurbishment of the factory, and extensive public realm improvements as well as new workshops, galleries, and studios for local businesses. The block is seven stories with a set back top storey, inset balconies, and glazed brick entrances.

Works done:

BSel were appointed as the external rendering contractor on this scheme to deliver a rendered finish on 2 of the walls of the block buildings as well as Car park entrance elevations:

  • 1000m² of Monocouche Render

Project Information:

Date: May 2023

Client: Formation Design & Build Limited

Project Outcomes: The works were completed on time and in line with the main contractor’s schedules to the required quality with less than 5 snags.

Lessons Learnt:

  • Enhanced our Cost and Schedule Tracking Systems through use of Daily and weekly logs/reports for outputs which were measured against programme and anticipated durations to ensure task is on track to complete in desired time and within budget.

BSel Contracts Ltd

Successfully Completed Contracts