Kennington Station

Kennington Station

Dates:

Works:

  • 70m2 of delta lining followed by render at height
  • 80Lm of evaporation channel designed, fabricated and installed
  • 170m2 of riblath followed by render
  • 170m2 of heratige ceramic wall tiling
  • 50Lm of accoustic panelling at height
  • 100 No delta lining and render repairs – track side including provision of access
  • 150m2 of screed to concrete slab
  • 150m2 of concrete pavers
  • 10 access hatches installed and over tiled with concrete pavers
  • 40Lm of render skirting

Client:

D and D Rail Ltd