Past Projects

 

BSel Contracts Ltd have successfully completed contracts in a number of different sectors from rail to hospitality.
Health, Safety, Quality and Environment (HSQE), programme,
customer satisfaction and value for money are our key objectives when undertaking projects.

Vauxhall Station

Dates

  • Commenced November 2014
  • Completed May 2016

Works

  • 200m2 of screed
  • 700m2 of Terrazzo floor tiles in ticket hall, cross passages and concourse
  • 300Lm of granolithic skirting installed insitu – not precast
  • 250m2 of ceramic wall tiling
  • 15 floor access hatches and overruling

Client

  • Bechtel Group

Kennington Station

Dates

  • Commenced October 2018
  • Completed April 2019

Works

  • 70m2 of delta lining followed by render at height
  • 80Lm of evaporation channel designed, fabricated and installed
  • 170m2 of riblath followed by render
  • 170m2 of heratige ceramic wall tiling
  • 50Lm of accoustic panelling at height
  • 100 No delta lining and render repairs – track side including provision of access
  • 150m2 of screed to concrete slab
  • 150m2 of concrete pavers
  • 10 access hatches installed and over tiled with concrete pavers
  • 40Lm of render skirting

Client

  • D and D Rail Ltd

 

Bank Station – Bloomberg

Dates

  • Commenced March 2017
  • Completed July 2018

Works

  • 1,200m² of Granazzocem floor tiling over 3 levels
  • Over 100 pre cast stairs with AATi nosing
  • 200Lm of Granazzocem skirting and bevel cut insitu
  • 22no floor access hatches and over-tiled
  • x M2 of x entrance matting
  • 30Lm of tactile pavers at tops and bottoms of stairs

Client

  • Elm Site Services Ltd

St Michaels Rectory

Dates

  • Commenced December 2018
  • Completed January 2019

Works

  • 200m2 of ceramic wall and floor tiling

Client

  • T H Kenyan Plc

Putney High Street Apartments

Dates

  • Commenced December 2018
  • Completed May 2019

Works

  • 400m2 of ceramic tiling with mitered corners to bathroom and shower room walls and floors
  • 35 Niches
  • 25 Shower floors
  • 100m2 quarry tiling to basement areas

Client

  • ARJ Construction Ltd

Finsbury Park Station

Dates

  • Commenced February 2014
  • Competed April 2014

Works

  • Screeded 35m2 of landings
  • Installed 35m2 terrazzo tiles on landings
  • Installed 40 treads and risers
  • Rendered 70m2 of walls and tiled with ceramics

Client

  • Cleshar Contract Services Ltd

Baker Street Station

Dates

  • Commenced May 2014
  • Completed December 2014

Works

  • Patch replaced over 400 terrazzo floor tiles
  • Replaced 60Lm of tactile pavers
  • Supplied tilers managed by client to replace 2000m2 of ceramic wall tiles

Client

  • Cleshar Contract Services Ltd

One Crown Place – Shoreditch

Works

  • Historic Bathrooms Walls and Floors – 800m2
  • Contemporary Bathrooms Walls and Floors – 300m2
  • Ground Floor Reception Mosaic Floor – 50m2

Dates

  • Commenced March 2021
  • Completed November 2021

The Old Gramophone Works

Works

  • Marmorin Venetian Plaster – 1,800 m2

Dates

  • Commenced  – April 2021
  • Completed – October 2021

Client

  • John Graham Construction

Stratford Marshgate Mill

Works

  • Shower Rooms Terrazzo Floors – 200m2
  • Shower Room Walls – 350m2
  • Shower Room Skirts – 500lm
  • Walls and Floors in Bathrooms – 1500m2
  • Stairs and Landings Terrazzo Tiles – 75m2
  • Reception area floor screed and tile – 215m2

Dates

  • Commenced February 2021
  • Completed August 2021

Client

  • Watkin Jones Ltd

Sutton Court Road

Works

  • Tiling Bathroom and Shower Pods (walls and floors) – 1,200m2
  • Levelling Pod Floors – 300m2
  • Reception Floor – 200m2

Dates

  • Commenced Oct 2020
  • Completed June 2021

Client

  • Watkin Jones Ltd

Kennington Station

Works

  • 70m2 of delta lining followed by render at height
  • 80Lm of evaporation channel designed, fabricated and installed
  • 170m2 of riblath followed by render
  • 170m2 of heratige ceramic wall tiling
  • 50Lm of accoustic panelling at height
  • 100 No delta lining and render repairs – track side including provision of access
  • 150m2 of screed to concrete slab
  • 150m2 of concrete pavers
  • 10 access hatches installed and over tiled with concrete pavers
  • 40Lm of render skirting
Dates

  • Commenced October 2018
  • Completed April 2019

Client

  • D and D Rail Ltd

Putney High Street Apartments

Works

  • 400m2 of ceramic tiling with mitered corners to bathroom and shower room walls and floors
  • 35 Niches
  • 25 Shower floors
  • 100m2 quarry tiling to basement areas
Dates

  • Commenced December 2018
  • Completed May 2019

Client

  • ARJ Construction Ltd

Bank Station – Bloomberg

Works

  • 1,200m² of Granazzocem floor tiling over 3 levels
  • Over 100 pre cast stairs with AATi nosing
  • 200Lm of Granazzocem skirting and bevel cut insitu
  • 22no floor access hatches and over-tiled
  • 30m2 of rubber entrance matting
  • 30Lm of tactile pavers at tops and bottoms of stairs

Dates

  • Commenced March 2017
  • Completed July 2018

Client

  • Elm Site Services Ltd

Towergateway DLR

Works

  • Removed 90m2 of existing ticket hall floor to a minimum depth
  • Leveled 90m2 of substrate with self levelling compound
  • installated 90m2 of Granazzocem floor tiles
  • Installed tactile pavers at the top of escalators
Dates

  • Commenced and completed in July 2016 over 2 weekend closures

Client

  • Marwells UK Ltd

Vauxhall Station

Works

  • 200m2 of screed
  • 700m2 of Terrazzo floor tiles in ticket hall, cross passages and concourse
  • 300Lm of granolithic skirting installed insitu – not precast
  • 250m2 of ceramic wall tiling
  • 15 floor access hatches and overruling

Dates

  • Commenced November 2014
  • Completed May 2016

Client

  • Bechtel Group

Finsbury Park Station

Works

  • Screeded 35m2 of landings
  • Installed 35m2 terrazzo tiles on landings
  • Installed 40 treads and risers
  • Rendered 70m2 of walls and tiled with ceramics

Dates

  • Commenced February 2014
  • Competed April 2014

Client

  • Cleshar Contract Services Ltd

Baker Street Station

Works

  • Patch replaced over 400 terrazzo floor tiles
  • Replaced 60Lm of tactile pavers
  • Supplied tilers managed by client to replace 2000m2 of ceramic wall tiles

Dates

  • Commenced May 2014
  • Completed December 2014

Client

  • Cleshar Contract Services Ltd

 

Gloucester Arcade, London

Works

  • Install access scaffolding to full façade of Emirates Airlines Head Office ready for cleaning.
  • Carryout cleaning using Nebulous water spray method.
  • Liaise with shops on ground floor and put up signs to ensure public are aware that the shops are still open.
  • Upon completion of the cleaning remove scaffolding

Dates

  • Commenced September 2019
  • Completed January 2020

Client

  • Cheval Property Management

Project Lords Cricket Ground, London

Works

  • Installation of access scaffolding for main cleaning works.
  • Cleaning carried out using the DOFF superheated water cleaning method.
  • Dig up existing failed concrete to the low level Mound Stand walkway
  • Clean up substrate prior to installation of new concrete.
  • Supply and install Fosroc Paveroc onto Fosroc Nitobond EP
  • Carryout cleaning of Bas Relief outside of Lord’s Cricket Ground
  • Clean using DOFF superheated cleaning method as approved by English Heritage.
  • Seal stone on completion

Dates

  • Commenced January 2019
  • Completed May 2019

Client

  • Marylebone Cricket Club