The building is located at the top of Goswell Road, there are 94 apartments and 4 houses in the development, with commercial space at the ground floor currently occupied by Virgin Active.

The main facades consist of a range of materials including: brick, render, copper, timber, and aluminium curtain walling. The objective of the project to replace all non compliant material with fire rated materials whilst causing minimal disruption to existing tenants.

Works done:

Excluding brick and copper facades, all other façade systems were removed and replaced as they did not meet current fire rating standards. In addition to this, all timber decked balconies, rendered soffits and cavity barriers were also to be replaced:

  • Stripped the existing non fire rated External Wall Insulation System 1500m²
  • Install new External Wall Insulation 1500m²
  • Plasterboard Soffits 300m²
  • Balcony Decking 500m²
  • Aluminium Wall Cladding 100m²
  • Removal & Replacement of electrical fittings, balustrades, water pipe work and other fixtures and fittings.

Project Outcomes

The works were completed on time with minimal disruption to the existing residents.

Lessons Learned

  • Create a movement of materials plan prior to project commencement.
  • Undertake daily cleanliness and tidiness audits.
  • Keep residents up to date with project progress.