External Wall Insulation
Capability
BSel are PAS 2030 certified specialist external wall insulation contractors working on various projects from commercial developments to domestic projects. BSel work to tight deadlines and maintain our high standards in our workmanship. Insurance Backed Guarantees up to 25 years are provided giving peace of mind.
BSel have been appointed to the latest Efficiency North gold standard Gen-4 framework framework for planned and responsive installation, servicing, repairs and maintenance works, valued at more than £3.2bn for Lot 27-External Wall Insulation.
Below are some of the EWI systems BSel install as a contractor:
The Team
We uphold and promote a high level of craft competence and workmanship. All work is guaranteed, and services are completed as promised.
Our friendly team are all NVQ Level 2 or Level 3 certified and will develop a relationship with you as a customer to ensure that you get the best possible result.
Past Project Case Studies
Project Objectives:
The building is located at the top of Goswell Road, there are 94 apartments and 4 houses in the development, with commercial space at the ground floor currently occupied by Virgin Active.
The main facades consist of a range of materials including: brick, render, copper, timber, and aluminium curtain walling. The objective of the project to replace all non compliant material with fire rated materials whilst causing minimal disruption to existing tenants.
Works done:
Excluding brick and copper facades, all other façade systems were removed and replaced as they did not meet current fire rating standards. In addition to this, all timber decked balconies, rendered soffits and cavity barriers were also to be replaced:
- Stripped the existing non fire rated External Wall Insulation System 1500m2
- Install new External Wall Insulation 1500m2
- Plasterboard Soffits 300m2
- Balcony Decking 500m2
- Aluminium Wall Cladding 100m2
- Removal & Replacement of electrical fittings, balustrades, water pipe work and other fixtures and fittings.
Project Information:
Date: Jan-May 2024
Client: Formation Design & Build Ltd
Project Outcomes: The works were completed on time with minimal disruption to the existing residents.
Lessons Learnt:
- Create a movement of materials plan prior to project commencement.
- Undertake daily cleanliness and tidiness audits.
- Keep residents up to date with project progress.